Log Work Sub-panel

In Tasks tab, Log Work sub-panel of the edit pop up is used to log work performed for any active task.

To access the log work sub-panel, scroll down to the bottom of the edit task dialog box and click on Log Work. A table is shown with currently logged work. Add button is provided to add new work log.

Use the “3w 4d 8h 20m” format to log work. Where w=weeks, d=days, h=hours, and m=minutes.

Work logs are used to generate time sheets and perform execution analytics in the Manage tab.

Back to Edit Tasks